BBS construction header image

Case Study:

Aylesford Bulls Rugby Football Club

Aylesford-Bulls-Clubhouse-1170x500

 

This is a traditionally constructed clubhouse comprising of function areas, changing rooms, kitchen and bar facilities and was undertaken using a Design and Build form of contract and part lottery funding. The contract included construction of a 200 space car park for the club

The project has been a springboard for Aylesford Rugby Club who have gone from strength to strength utilising the comprehensive facilities of this excellent clubhouse


Case Study:

Chart Hills Golf Club, Biddenden

Charts Hills entrance 1 1170x500

 

A large and complex championship clubhouse, part steel frame, part load bearing masonry, this new  build project features an impressive cantilevered roof over the bar area.

Part of the building is, of necessity, sub-terranean in order to reduce it’s impact on the local landscape.

Architect Malcolm Hollis Associates was the designer


Case Study:

Village Hall, Godmersham

BBS_Godmersham_05_lr

 

Completed in 2013. £520k traditionally procured bespoke village hall for Godmersham and Crundale. Single storey building with a community hall featuring a high level profiled ceiling.

A combination of a timber and steel frame. Included meeting rooms, toilets and kitchens for use by the local community.

Designed by architect Chris Saunders of Cranbrook.


Case Study:

Multi Purpose Hall, Somerhill School, Tonbridge

Design-and-Build

 

This new sports and multi purpose hall at Somerhill School, Tonbridge, incorporates changing and leisure facilities with a general amenity area for the students.

The building had interesting design features, which utilised acoustic blocks and curved steel members to form a barrel roof.

Designed by Architects Madgwick and Dottridge


Case Study:

Restaurant at Chapel Down

Chaple Down 1170x500

 

When Richard Phillips and Chapel Down began a joint restaurant venture, BBS were appointed to carry out the structured alterations, which comprised of demolition, erection of structural steel work, strengthening of the existing structure and associated works.