This is a traditionally constructed clubhouse comprising of function areas, changing rooms, kitchen and bar facilities and was undertaken using a Design and Build form of contract and part lottery funding. The contract included construction of a 200 space car park for the club

The project has been a springboard for Aylesford Rugby Club who have gone from strength to strength utilising the comprehensive facilities of this excellent clubhouse


Case Study:

Contemporary private house at Leigh near Tonbridge

 

This six bedroom New Build house was built in extensive grounds with a high standard of finishes. The building consisted of a waterproof concrete basement and extensive remodelling of the external landscape and installation of a swimming pool.

MKA Architects were the designers on this project

 


Case Study:

Chart Hills Golf Club, Biddenden

Charts Hills entrance 1 1170x500

 

A large and complex championship clubhouse, part steel frame, part load bearing masonry, this new  build project features an impressive cantilevered roof over the bar area.

Part of the building is, of necessity, sub-terranean in order to reduce it’s impact on the local landscape.

Architect Malcolm Hollis Associates was the designer


Case Study:

Heath Farm School, Special Needs Classrooms, Charing Heath

Heath-Farm-School-1170x500

This £1.2M Design and Build development, completed in April 2010, was carried out for a special needs school and consisted of three new timber framed classroom blocks with extensive external works in the middle of the School campus.

In 2015 we returned to the school and negotiated the design & build of two further classrooms here, which were completed in 2016

The Architect was Shane Jell of Sub Rosa Architects on both projects.

RIBA award winning project.


Case Study:

Lynwood private house, Tunbridge Wells

New-House

 

 

This New Build project, designed by MKA Architects, was an individually designed house featuring many unusual architectural details.

This prestigious project won several design awards including the RIBA Downland Prize, The Kent Design Award Best Residential Scheme, Kent Design Award Overall Winner and was short listed for the National RIBA Awards.


Case Study:

Benenden School Science Block, Cranbrook

_SYL0633 1170x500

 

This £7.4m project was commissioned by Benenden Girls School to promote excellence in the Sciences and consists of three floors housing teaching and preparation facilities for Biology, Physics and Chemistry, together with full height atrium and entrance area.

The building was designed by an award winning Architect and contains many interesting design features which focus on the use of oak joinery.

A success story for BBS Construction and the continuation of an excellent working relationship with the school which has been ongoing for over nine years.

 


Case Study:

MacDonald Court, Paddock Wood

McDonald-Court-1170x500

 

Completion in March 2015. £3.9m contractors D&B project. New build three storey block providing 39 affordable sheltered flats for Town & Country Housing Association. A Chartway development for our parent group company.

Logistically challenging site with limited access through a busy residential estate requiring close neighbourhood liaison with local residents and businesses during construction. Timber framed construction with brickwork, render and tile hung external features. Designed by BDB Design LLP of Canterbury.


Case Study:

Village Hall, Godmersham

BBS_Godmersham_05_lr

 

Completed in 2013. £520k traditionally procured bespoke village hall for Godmersham and Crundale. Single storey building with a community hall featuring a high level profiled ceiling.

A combination of a timber and steel frame. Included meeting rooms, toilets and kitchens for use by the local community.

Designed by architect Chris Saunders of Cranbrook.


Case Study:

Industrial Units at Corbens Yard, Maidstone

Corbens yard shed 1 1170x500

 

This was a purpose built industrial unit at Corbens Yard in Maidstone.

Constructed on a restricted site using mass concrete foundations, cavity brickwork, structural steel frame and composite cladding to roof and walls. This project involved the building of several industrial units over several phases owing to the operational requirements of the client’s estate and the restricted nature of the site


Case Study:

New Industrial Unit, Aylesham

Industrial Unit 1170x500

 

This project consisted of a 2000 square metre industrial unit which was then leased to the NHS.

The construction comprises of traditional mass concrete foundations, steel frame and cladding.


Case Study:

Bennett School Sixth Form Centre, Culverden Road, Tunbridge Wells

BBS_BennettMemorial_03 1170x500

 

New sixth form centre. £1m project. New build single storey block. Strip foundations, pcc plank floors and traditional loadbearing walls.

A unique feature was the utilisation of a combination of Vierendeel trusses and Metsec lattice beams to give an economical structural solution for clear spans over the sixth form common areas.

Structural Engineers were CTP of Sevenoaks. Architects were ECE of Worthing.


Case Study:

Granville School Early Learning Centre, Sevenoaks

BBS_Granville_03 1170x500

 

Completed in 2014. Early Learning Centre for Granville School. Traditionally procured £980k project.

Logistically challenging project in the heart of the existing school requiring BBS to closely liaise with the staff and pupils with regard to delivery of materials and management of health and safety at all times. A new build 2 storey building . Traditionally built with cavity walls, SIPS panel roof with slate tile covering. The facility contained new classrooms, art rooms, WCs and eating areas for independent operation of the centre.

Designed by HMY Architects. BBS & HMY are currently assisting the school with designing and costing of a new multi-purpose school hall


Case Study:

Flats at Victory House, Church Street, Tovil

BBS_Church_Rd_Tovil01_lr

 

This project was carried out for a private developer and comprised of a three storey block of six flats and one new adjacent house. The contract value was £700k and it was completed in August 2014

A challenging foundation design to overcome the close proximity of adjacent properties and existing cellars, which formed part of the old pub previously on the site. the building was traditionally constructed with particular emphasis on sustainability including the use of photo voltaic panels on the pitch roof.

Designed by HMY Architects.


Case Study:

Heads House, Brambletye School, East Grinstead

Heads House & Garden Brambletye

Completed in September 2014 at this independent school in East Grinstead.

The New Headmaster’s House. Traditionally procured £400k project. New four bedroomed detached property with piled foundations. Timber framed construction with high standard of finishes throughout. Externally finished with render and chestnut cladding. Designed by HMY Architects.

This was the most recent phase of several BBS Construction carried out at this independent school including previously a new £1.2m teaching block on the main entrance drive into the School. Owing to its prominence, it was required to be both striking and in keeping with the old manor house which sits behind.

BBS & HMY Architects are currently helping the school cost future feasibilities here.


Case Study:

Cudham Frith Farm, Cudham

Cudham Frith Farm 1170x500

 

This New Build contract at Cudham Frith Farm, Cudham, comprised of the construction of a large three story individual house for a private client. All completed to a high standard of finish