Case Study:

Extension to and Reconfiguration of A&E Unit, Maidstone Hospital

Maidstone A&E front with ambulance 1170x500

 

This £850k extension to this busy hospital and reconfiguration of the A&E Unit at Maidstone Hospital was designed by Architect Building Ideas.

Close liaison with hospital and ward staff was essential for the duration of this contract, which was carried out eleven phases. The A&E Unit remained operational throughout the works.


Case Study:

The Horder Centre New Operating Theatres, Crowborough

BBS_Horder_Centre_12_lr

 

One of many contracts undertaken by BBS in the healthcare sector, this project comprised the construction of two new Operating Theatres and TSSU unit. The contract was valued at £2.18m.

The architect on this project was Building Ideas of Maidstone


Case Study:

Reconfiguration of the Horder Centre

1170

The extensive remodelling work at this private hospital is an on-going contract for BBS Construction comprising of many phases including the provision of 16 new bedrooms, new reception area, new dining area and kitchens, refurbishment of existing bedrooms and outpatient departments.

The master plan centres around the extension. refurbishment and improvement of the whole site and is carried out whilst the hospital is fully operational.

Latest of many phases of work that BBS Construction have delivered over the past 15 years, was a recent negotiated £1.6m phase to add six new ensuite hospital bedrooms.  Included in this phase were alterations and refurbishments to the existing hospital kitchens and a new dining room. All works were carried out in a sensitive live hospital environment with the same team who have an excellent working relationship with the hospital staff on this busy site.

The total value of the works to date is in excess of £11m most of which has been negotiated with the client over the latter five year period. The architect on all these projects was Building Ideas of Maidstone.